Our projects
Ten projects that sum up what we do: land reclamation deep in the desert, a university campus, and residential and service buildings from frame to finish, for the Military Works Department and the Mostakbal Misr Authority for Sustainable Development.

Misr El-Ganoub Project
East Oweinat — New Valley

Sanabel Sono
Aswan

South Valley National University
Qena

Gawharat El-Assema
New Administrative Capital

Sakan Ahl Masr — El-Salam
Cairo

Equestrian City Villas — Marabet Misr
International Equestrian City — East Cairo

Social Club — Marabet Misr
International Equestrian City — East Cairo

Hayah Karima — El-Husseiniya & El-Qassasin
Sharqia & Ismailia

Senior Commanders' Club — El-Kayan
Cairo

Physiotherapy Unit — Engineering Authority House
Cairo
And other works we delivered
Mostakbal Misr — wells & paving
Drilling and completing four water wells and paving works, alongside the residential, administrative and warehouse programme.
Ahalina — El-Salam
Two residential buildings: interior finishing and water-supply and drainage networks.
Building R3 — New Capital
Final finishing works within the 246-building project.
Leisure Valley — Equestrian City
General site preparation of the leisure valley at Marabet Misr.
Marabet Misr — waste removal
Waste removal and haulage with a fleet of loaders and heavy trucks over three months.
El-Qassasin — Hayah Karima
General site works for the Hayah Karima project at El-Qassasin.
New Mansoura General Hospital
Upgrading and rehabilitation of the hospital, 2025.
Alternative Cemeteries — North of Geneifa Road
Ten cemetery blocks in Sector B, Suez — 380 units, 2024.
Beneath the Maj. Gen. Salah El-Shazly Bridge
General site finishing and two public washroom buildings in the vehicle-workshop area, 2024 – 2025.